Background

Windsor Street is a two-way two-lane Urban Industrial classified road in the western area of the City of Abbotsford. Windsor Street connects road users to residential, educational, and light industrial areas and land uses. Transit currently operates along a section of Windsor Street. Current travel patterns indicate that Windsor Street is currently used by a variety of road users including pedestrians, cyclists, transit users, vehicles, and truck traffic.

Over the past number of years, residents along Windsor Street have expressed concerns regarding road safety and traffic. Community concerns have centered on speeding, truck traffic, traffic noise, pedestrian crossings, and the overall "look and feel" of Windsor Street.

City of Abbotsford Transportation and Transit Master Plan

In 2018, the City of Abbotsford Transportation and Transit Master Plan was developed to guide strategy, actions, and investments in developing our overall transportation network through 2040. The Windsor Street Traffic Calming project seeks to support the following goals of the City of Abbotsford Transportation and Transit Master Plan:

  • Make walking, biking and transit delightful
  • Move people and goods in a way that is safe, accessible and equitable and that supports the City’s economy
  • Ensure all modes provide connections to important destinations and areas of future growth and development
  • Ensure that the transportation system supports land use decisions
  • Design streets to be complete destinations that support walking, biking and social interactions
  • Ensure that the transportation system is well-maintained
  • Plan and prepare for changes to the transportation system from emerging technologies

Updates

March 26, 2026

Detailed design is approaching completion, and the City will be conducting virtual public consultation activities in April 2026 to gather feedback and comments on the proposed changes. If you would like to participate in public consultation, please contact Jeff Pascua (jpascua@abbotsford.ca).

Contractor procurement is now planned for May 2026, with construction activities now scheduled during summer break (July-August 2026).

July , 2025

Following the City of Abbotsford’s 2023 Traffic Calming program, traffic calming measures will be implemented along Windsor Street.

Preliminary design is complete and we are now in the Detail Design phase of this project, finalizing the design prior to construction. Please refer to the Preliminary Design drawings in the Documents section for updates made since the Conceptual Design.

Upon design completion, the City will proceed with contractor procurement in late Summer 2025, transitioning to the Construction phase. Construction is anticipated to commence Fall 2025.

Share Your Ideas

Ask a Question

Provide a short summary of your question.

You have 150 characters left

Provide detailed information relating to your question.

You have 500 characters left

Select a respondent from the list that you would most like to answer your question.

Moderation Policy

These are the people that are listening and responding to your questions.

The Project Team

{{ question.username }} asked

{{question.description}}

{{ answer.respondent.name }}
| Edited

Answer this question

Select the respondent who will be marked as answering the question

Provide the answer to the question. Answer can be saved as draft and published when complete.

No questions found

FAQs